Miami Directional Drilling

Scope a Bore in South Florida

Send the two ends, what's going in the ground, and what it crosses — a street, a canal, rail, or all three, which happens here more than anywhere. The desk decomposes the scope the South Florida way (fluid program, district permits, potholes, pits with pumps, MOT, pullback, restoration) and a person calls back with the number.

No instant pricing lives on this page, on purpose. Over porous rock and a sole-source aquifer, an auto-quote is a guess about fluid behavior; Pending Review means a human priced your actual crossing.

Draw a Bore — drop an entry pin and an exit pin, we scope the rest. Activates when the map key is configured; the form below captures the same scope either way.

No auto-price. A person reviews your scope and calls back with the number — sheets show “Pending Review” until then.